Over 650 circuit miles of 220kV Transmission Line upgrade, delivering electricity from California Desert substations to population centers of the Inland Empire and San Gabrial Valley
Overhead and Subterrain Quality Inspections, including Vaults, Conduit Stubouts, Foundations, Structures, Wire Sagging & Hardware Installation
Trained and Certified for Helicopter Operations
Quality Assurance for Wire Stringing, Sagging, and Hardware Installation
Trinity Cotton Wood
115kv Transmission Line Reconductor
Wire Sagging with QA/QC Sag & Hardware Verification on multiple phases of this 115kV Reconductor Project in Shasta & Trinity Counties
Quality Inspections during Stringing Operations as well as Marker Ball Installation, complete with Helicopter Ops
Oroville Dam
240 kV Transmission Line
Surefire provided QA/QC Inspections during this emergency re-route project, as the Oroville Generation Station was nearing collapse, and required emergency re-routing
Oroville Dam - Trench in street
Baldy Mesa
115KV Transmission Line Upgrade
QA/QC Inspection during stringing and sagging operations
Surefire inspectors completed Sag Verification as well as Direct Embed and Megger Test reporting.
HASKELL SYLMAR
230KV Wire Sag & Xray
Surefire provided Quality Assurance Oversight on this 230 kV Transmission Line Project
Deadend XRays were also a requirement of the project, verifying & validating proper installation
Surefire provided day and night crews with an additional team for performing back to back deadend XRay inspections during the course of construction